美女被免费网站视频九色-美女被啪到哭网站在线观看-美女被拍拍拍拍拍拍拍拍-美女被色-4438x亚洲最大-4444狠狠

你現(xiàn)在的位置:首頁>企業(yè)動(dòng)態(tài)

灌膠機(jī)打完膠更換另一種膠要怎么做?

瀏覽:0
  灌膠機(jī)打完膠更換另一種膠要怎么做?
  How to replace another glue after the glue filling machine is finished?
  不少客戶在運(yùn)用灌膠機(jī)打商品時(shí),因?yàn)榧夹g(shù)紛歧樣,也許在打此外某類商品時(shí)需替換膠水,紛歧樣品種的膠水夾雜在一起,會(huì)起化學(xué)反映,會(huì)引起膠水中毒,致使灌出的商品達(dá)不到質(zhì)量需求。所以在替換膠水時(shí)必然要做好潔凈工作,下面由灌膠機(jī)廠家信華為我們作一下介紹:灌膠機(jī)清洗事項(xiàng)
  Many customers use glue machine to make goods, because the technology is different, maybe they need to replace glue when they make some other goods. The glue mixed with different samples will cause chemical reaction, which will lead to glue poisoning, so that the products can not meet the quality requirements. So when replacing glue, we must do a good job of cleaning. Below, Xinhua, the glue machine manufacturer, will introduce the cleaning of glue machine.
  1. 請(qǐng)與膠水供應(yīng)商承認(rèn)膠水潔凈劑。
  1. Please acknowledge the glue cleaner with the glue supplier.
  2. 封鎖AB料桶底部閥門。
  2. Block the bottom valve of AB barrel.
  3. 操作設(shè)備出膠,將殘留在膠閥,高壓鐵氟龍管,AB泵內(nèi)部的膠水打出,可查詢拜訪膠閥出膠口膠量改變,判斷內(nèi)部膠水已排空。
  3. Operating equipment gum out, the glue remaining in the rubber valve, high-pressure ferrofluorine hose, AB pump out, you can inquire about the change of gum volume at the rubber valve outlet, judge that the internal glue has been emptied.
  4. 封鎖設(shè)備總電源。
  4. Blocking the general power supply of the equipment.
  5. 拆開料桶底部膠管,翻開閥門,將料桶殘剩膠水排出。
  5. Remove the rubber hose at the bottom of the barrel, open the valve and discharge the residual glue from the barrel.
  6. 封鎖料桶底部閥門,將適量潔凈劑倒入料桶,將桶壁與桶底殘剩的膠水潔凈干凈。
  6. Block the bottom valve of the barrel, pour a proper amount of cleaner into the barrel, and clean the remaining glue on the barrel wall and bottom.
雙組份打膠機(jī)
  7. 翻開料桶底部閥門,將污水排出,料桶不行有殘?jiān)?/div>
  7. Open the bottom valve of the barrel and discharge the sewage. There is no residue in the barrel.
  8. 拆下AB泵,將泵內(nèi)部膠水整理干凈(需受過拆裝泵操練人員操作此項(xiàng))。
  8. Remove the AB pump and clean up the glue inside the pump (it needs to be operated by the operator who has disassembled and assembled the pump).
  9. 將干凈AB泵裝回原位,與料桶膠管從頭接上。
  9. Install the clean AB pump back to its original position and connect it with the barrel hose from scratch.
  10. 灌膠機(jī)替換高壓鐵氟龍管。
  10. Replace high-pressure ferrofluorine hose with glue filler.
  11. 倒入新膠水。
  11. Pour in new glue.
  12. 敞開設(shè)備,點(diǎn)動(dòng)出膠3~5分鐘,承認(rèn)膠水出膠正常。
  12. Open the equipment and point out the glue for 3-5 minutes. Admit that the glue is normal.
  13. 從頭分配AB膠水比例。
  13. Distribution of AB glue ratio from scratch.
  依照上面過程,將全部灌膠機(jī)潔凈干凈,再換膠水去灌膠凡是是不會(huì)呈現(xiàn)質(zhì)量疑問的。
  According to the above process, all the glue-filling machines will be clean and clean, and then change the glue to glue-filling will not always present quality doubts.

上一篇:如何做好雙面上膠機(jī)的保養(yǎng)工作?
下一篇:自動(dòng)點(diǎn)膠機(jī)膠體粘度對(duì)產(chǎn)品的影響!

  • 微信
主站蜘蛛池模板: 亚洲国产成人99精品激情在线 | 日韩欧美福利 | 精品国产免费观看久久久 | 宅男天堂影院 | 在线免费视频a | 日日干天天干 | 成人手机在线视频 | 国产日韩欧美精品一区 | 看全色黄大色黄大片 视 | 久久亚洲国产最新网站 | 男女日批视频在线观看 | 一本大道在线 | 一二三四视频社区在线网 | 日韩一级精品久久久久 | 五月丁香啪啪 | aaa免费视频 | 交视频在线播放 | 国产日韩一区 | 干干干日日日 | 亚洲国产精品一区 | 欧美一区二区三区在线观看不卡 | 亚洲视频一二区 | 免费国产不卡午夜福在线 | 制服丝袜中文字幕第一页 | 欧美色图另类图片 | 亚洲精品国产成人专区 | 2015小明永久领域日韩 | 五月婷婷在线观看视频 | 男女视频在线观看免费高清观看 | 国产特黄特色a级在线视 | 欧美成人免费一级人片 | 最新亚洲精品国自产在线 | 亚洲福利视频一区二区 | 看看的在线视频国产 | 奇米影视亚洲 | 日本欧美国产精品第一页久久 | 亚洲欧美日韩中文在线制服 | 夜天干天干啦天干天天爽 | 婷婷亚洲久悠悠色悠在线播放 | 国产一区a | 中文字幕在线免费 |