美女被免费网站视频九色-美女被啪到哭网站在线观看-美女被拍拍拍拍拍拍拍拍-美女被色-4438x亚洲最大-4444狠狠

你現在的位置:首頁>企業動態

灌膠機打完膠更換另一種膠要怎么做?

瀏覽:0
  灌膠機打完膠更換另一種膠要怎么做?
  How to replace another glue after the glue filling machine is finished?
  不少客戶在運用灌膠機打商品時,因為技術紛歧樣,也許在打此外某類商品時需替換膠水,紛歧樣品種的膠水夾雜在一起,會起化學反映,會引起膠水中毒,致使灌出的商品達不到質量需求。所以在替換膠水時必然要做好潔凈工作,下面由灌膠機廠家信華為我們作一下介紹:灌膠機清洗事項
  Many customers use glue machine to make goods, because the technology is different, maybe they need to replace glue when they make some other goods. The glue mixed with different samples will cause chemical reaction, which will lead to glue poisoning, so that the products can not meet the quality requirements. So when replacing glue, we must do a good job of cleaning. Below, Xinhua, the glue machine manufacturer, will introduce the cleaning of glue machine.
  1. 請與膠水供應商承認膠水潔凈劑。
  1. Please acknowledge the glue cleaner with the glue supplier.
  2. 封鎖AB料桶底部閥門。
  2. Block the bottom valve of AB barrel.
  3. 操作設備出膠,將殘留在膠閥,高壓鐵氟龍管,AB泵內部的膠水打出,可查詢拜訪膠閥出膠口膠量改變,判斷內部膠水已排空。
  3. Operating equipment gum out, the glue remaining in the rubber valve, high-pressure ferrofluorine hose, AB pump out, you can inquire about the change of gum volume at the rubber valve outlet, judge that the internal glue has been emptied.
  4. 封鎖設備總電源。
  4. Blocking the general power supply of the equipment.
  5. 拆開料桶底部膠管,翻開閥門,將料桶殘剩膠水排出。
  5. Remove the rubber hose at the bottom of the barrel, open the valve and discharge the residual glue from the barrel.
  6. 封鎖料桶底部閥門,將適量潔凈劑倒入料桶,將桶壁與桶底殘剩的膠水潔凈干凈。
  6. Block the bottom valve of the barrel, pour a proper amount of cleaner into the barrel, and clean the remaining glue on the barrel wall and bottom.
雙組份打膠機
  7. 翻開料桶底部閥門,將污水排出,料桶不行有殘渣。
  7. Open the bottom valve of the barrel and discharge the sewage. There is no residue in the barrel.
  8. 拆下AB泵,將泵內部膠水整理干凈(需受過拆裝泵操練人員操作此項)。
  8. Remove the AB pump and clean up the glue inside the pump (it needs to be operated by the operator who has disassembled and assembled the pump).
  9. 將干凈AB泵裝回原位,與料桶膠管從頭接上。
  9. Install the clean AB pump back to its original position and connect it with the barrel hose from scratch.
  10. 灌膠機替換高壓鐵氟龍管。
  10. Replace high-pressure ferrofluorine hose with glue filler.
  11. 倒入新膠水。
  11. Pour in new glue.
  12. 敞開設備,點動出膠3~5分鐘,承認膠水出膠正常。
  12. Open the equipment and point out the glue for 3-5 minutes. Admit that the glue is normal.
  13. 從頭分配AB膠水比例。
  13. Distribution of AB glue ratio from scratch.
  依照上面過程,將全部灌膠機潔凈干凈,再換膠水去灌膠凡是是不會呈現質量疑問的。
  According to the above process, all the glue-filling machines will be clean and clean, and then change the glue to glue-filling will not always present quality doubts.

上一篇:如何做好雙面上膠機的保養工作?
下一篇:自動點膠機膠體粘度對產品的影響!

  • 微信
主站蜘蛛池模板: 一级一片在线播放在线观看 | 私人毛片 | 天天碰天天操 | 久久午夜影视 | xxxx国产片| 欧美中文字幕视频 | 性欧美video超清 | 亚洲日本一区二区三区在线 | h片在线播放 | 成人看视频 | 欧美成人一区二区三区在线视频 | 1000部羞羞视频在线看视频 | 日本黄漫画网站入口免费 | 在线观看免费成人 | 羞羞视频成人 | 色免费视频 | 黄色在线视频网 | 日韩黄色小视频 | 青青草国产精品欧美成人 | 欧美成人禁片在线www | 日韩一区二区三区视频在线观看 | 成人看片免费无限观看视频 | 亚洲欧美综合一区二区三区四区 | 成人欧美在线视频 | 精品国产品欧美日产在线 | 亚洲 欧美 中文字幕 | 国产成人精品一区 | 久久狠狠色狠狠色综合 | 久久综合久久综合久久 | 欧美在线观看一区 | 最近更新免费中文字幕大全 | 日本三级香港三级妇三 | 亚洲无线一二三四区手机 | 国产成人精品男人的天堂538 | 久久亚洲国产的中文 | aaaaaaaaa在线观看 | 波多野结衣综合 | 国产欧美日韩亚洲精品区2345 | 5060午夜一级毛片 | 一级特黄特黄xxx视频 | 18黄网站 |